Versatile Services Llc
Permits (76)
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Installation of non-load bearing partitions as per plans. no change in use, egress or occupancy.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Architectural modifications to the 13th floor as per plans. No change to use, egress, or occupancy.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Install partitions as per plans.
Mechanical changes as indicated on plans.; including the installation of 4.5 TON Condensing Unit and (3) Split System AC Units.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Interior demo of non load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Architectural changes as indicated on plans.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts & piping on the 10th floor (CCRB) as per plans. No change to use, egress or occupancy.
Mechanical changes as indicated on plans.