Duct work modifications as per plans.
HVAC removals on the 1st floor as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings and finishes on the 1st floor as per plans. No change to use, egress or occupancy.
Mechanical changes as indicated on plans
Interior demo of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Mechanical changes as indicated on plans.
Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of walls, floors and columns on the 10th floor (Demo & Whitebox) as per plans. No ch…
Modifications to the existing HVAC system on the 10th floor (Demo & Whitebox) as per plans. No change to use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Installation of non-load bearing partitions as per plans. no change in use, egress or occupancy.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Architectural modifications to the 13th floor as per plans. No change to use, egress, or occupancy.
Mechanical changes as indicated on plans; including the Installation of (2) 34 TON AC Units .
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.