Mechanical changes as indicated on plans.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Mechanical changes as indicated on plans; including the Installation of (2) 34 TON AC Units .
Architectural changes as indicated on plans.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Proposed renovation of existing amenity space at cellar level, no change to use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Mechanical changes as indicated on plans.; including the installation of 4.5 TON Condensing Unit and (3) Split System AC Units.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts & piping on the 10th floor (CCRB) as per plans. No change to use, egress or occupancy.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.