Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Proposed renovation of existing amenity space at cellar level, no change to use, egress or occupancy.
Architectural modifications to the 13th floor as per plans. No change to use, egress, or occupancy.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Mechanical changes as indicated on plans.
Install partitions as per plans.
Interior demolition of partitions, doors as indicated on plans.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo of non load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Modifications to the existing HVAC system and associated ducts & piping on the 10th floor (CCRB) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.