Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
Elevator machine room roofing membrane replacement (EMR Roof), as per plans. No change to use, egress, or occupancy.
Mechanical changes as indicated on plans.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Install partitions as per plans.
Interior reno & demo of non-load bearing partitions, walls, ceiling & finishes as indicated on plans.
Interior demolition of partitions, doors as indicated on plans.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.