Renovation Permits in San Francisco, California
4,090 renovation permits filed recently
4,090 permits
revision to 202602206295, 1st fl remodel bath, add 1 bedroom, add deck at rear
revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls.
select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use fro...
comply with nov# 202652131: new concrete in front set back and new paver.
to comply with nov# 201842361. revise pa#2016-0218-4906. occupancy use to remain s-1. remove (e) interior non bearing partitions and unpermitted work.
to obtain final inspection for work approved under pa# 202305016840, 202405091787 & 202501077896. all work is complete.
rev to pa# 2025-0722-1315: add posts and footing, beams to resupport 2nd fl. stair revise door to garage.
to obtain final inspection for work approved under pa#202305308856
recommencement and completion of work approved under pa#202105070015...
6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft
l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep.
bldg 13: exterior building repairs to include entryways, stairs, balconies & garage doors as needed. no work in right of way
bldg #12:(1440, 1450, 1460, 1470,1480) exterior building repairs to include entryways, stairs, balconies & garage doors as needed. no work in right of way
level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and...
unit 14b, room mr10. remove (e) kitchenette fab and insstall new cabintry and sink.
add (n) rear deck 171 sqft convert (e) media room and (e) storage to be (n) office & (n) bedroom 594.41 sqft. add (n) bathroom & relocate (e) bathroom at 1st fl. remodel (e) kitchen & (e) living room...
create emergency egress window, street level windows in the west bay were replaced with cmu. project is to restore a window with emergency egress compliant function serving an apartment unti. saw cut...
install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest report
recommencement and completion of work approved under pa#201904168150
bldg 3- exterior buliding repairs to include entryways, landing balconies and garage doors as needed, in-kind. replace metal gates@ breezeway and mailboxes as needed.