4,087 renovation permits filed recently
4,087 permits
to obtain final inspection for work approved under pa#201805118862, 201912200129, 202304055106. all work is complete.
unit #247 & #249:to comply with physical inspection report#cc-8744, (n) 20 min. door with self closing hardware and self closing hardware and seals for each unit entry door.(door s…
1/f: add office, family room, and wet bar with 2 burner.
bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & r…
revision to pa 201403211426 ref pa 202211307370 update fire sprinkler system nfpa13r to nfpa 13d update front facade to be fiber cement board
install 2 new garage doors, in kind in existing openings. to comply with nov#202651660.
bathroom remodel, in kind.
voluntary structural strengthening .replace front entry at commercial unit
3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.
recommencement and completion of work approved under pa# 2024-1112-4810
rev 202508122872: overlay tiles in (e) front stairs in-kind.
revision to f/a permit 202602055345. move notification aux. circuit (nac) booster to tradesman alley.
1/f: new office, 2 new baths, bedroom, wet bar. relocate laundry/mech. 2/f: kitchen remodel and 2 new bathrooms.
rev 202504013462: 1/f shift bathroom and wet bar per plan. 1 new rear opening.
new scope - 2nd floor: change kitchen layout, remove wall, upgrade ceiling joist per plan; new scope - add one story rear deck at back of the house; structural revision to bpa: 202…
deferred mep for permit 202601304958.
remove the current linoleum flooring on concrete slab flooring inside (1) walk-in refrigerator and inside restaurant, and install new floor tiles. no layout changed and no structur…
revision to pa# 202212158453 & 202508062396, scope reduction, updated units requiring duct smoke detectors.
revision to # 202509266243: 1f - remodel (e) master bedroom, (e) bathroom. add (n) media room, entertainment area w/ wetbar. 2/f - add (n) bedroom. remodel (e) kitchen, dining, mas…
unit 2c: remove tub and replace with shower, same size and location. replace drywall with green board in wet area.