Renovation Permits in Minneapolis, Minnesota
479 renovation permits filed recently
479 permits
Remodel portions of existing Rec Center -ACW certificate of occupancy required: no special inspections required: no const type: IIB occupancy: A3 2020 MSBC occupant load: 199 sprinklered: no Floor(s):...
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOW...
Renovation of building to create a Rehabilitation Center including exterior walkway, interior finishes, lift, and toilets/accessibility upgrades -ACW certificate of occupancy required: no special insp...
Replace an additional 12 windows within existing openings.
Interior remodel at existing 1-story sfd - replace all windows in existing openings; finish basement including installation of casement egress window and window well; create new half bathroom at main...
1 exterior door replacement - no alterations to existing opening - front door
Repair - Installation of interior drain tile and sump pump.
Basement floor remodel to install drywalls on walls and ceiling in existing single family house. aaj (project dox plan and document file photos) - repair drywall damages in existing basement walls and...
Install 191 feet wall encapsulation on north-east basementwalls , 21 feet interior drain tile system, 1/2 horse power sump pump, sump basket, sump lid and discharge in existing basement floor of a sin...
Install new draintile system, sump pump, basket and discharge in existing basement floor of a single family house. aaj (project dox plans and documents) - install 76'0" interior drain tile, 1/2 horsep...
Demo attached garage and replace portion of exterior wall, frost footing, slab, driveway, retaining walls, and exterior stairs -ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAP...
(DMH-Pdox) REMOVE & REPLACE TUB AND TUB SURROUND IN SFD. NO WINDOW REPLACMENT. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC...
INSTALL WALL PANELS, FLOORS 3-19 2020 MSBC architect: 55311 - Steinkamp, Scott Michael @ RSP
T/I - LOBBIES, FLOORS 1 & 2, "THE CROSSINGS" const type: R2 occupancy: IB 2020 MSBC architect: 55311 - Steinkamp, Scott Michael @ RSP
INFILL STAIRWAY OPENING ABOVE SUITE 1900 const type:IA occupancy: B 2020 MSBC sprinklered: yes architect: 23558 - Walz, Jeffrey Lee @ GENSLER engineer: 44681 - Thomas, Matthew Earl @ MBJ
Basement floor finished in existing single family house. aaj (project dox plans). - install new everlast basement wall panel system per esr 2680 (energy walls) and metal u-channel and metal studs(part...
Replace storefront and basement stairs -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC architect: Flores, Catherine Mary
modify boiler room walls to be 1 hr fire rated. revisions to BLDG1002828
(DMH-Pdox) REMODEL ENTIRE SFD. NEW REAR DORMER ADDITION FOR NEW ATTIC BEDROOM. - 2020 MNSBC REMODEL ALL BATHROOMS & KITCHEN IN NEW LOCATION. BASEMENT EGRESS WINDOW & WELL FOR NEW BEDROOM, FAMILY ROOM...
(DMH-Pdox) INSTALL BASEMENT WET BAR IN DUPLEX. USED WITH 1ST FLOOR UNIT. VERIFY DIRECT ACCESS FROM WITHIN 1ST FLOOR UNIT. NO COMMON STAIRS ACCESS. NOT REVIEWED OR APPROVED FOR ANY BASEMENT BEDROOM. AP...