Renovation Permits in Minneapolis, Minnesota
484 renovation permits filed recently
484 permits
Basement floor finished in existing single family house. aaj (project dox plans). - install new everlast basement wall panel system per esr 2680 (energy walls) and metal u-channel and metal studs(part...
Replace storefront and basement stairs -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC architect: Flores, Catherine Mary
modify boiler room walls to be 1 hr fire rated. revisions to BLDG1002828
(DMH-Pdox) REMODEL ENTIRE SFD. NEW REAR DORMER ADDITION FOR NEW ATTIC BEDROOM. - 2020 MNSBC REMODEL ALL BATHROOMS & KITCHEN IN NEW LOCATION. BASEMENT EGRESS WINDOW & WELL FOR NEW BEDROOM, FAMILY ROOM...
(DMH-Pdox) INSTALL BASEMENT WET BAR IN DUPLEX. USED WITH 1ST FLOOR UNIT. VERIFY DIRECT ACCESS FROM WITHIN 1ST FLOOR UNIT. NO COMMON STAIRS ACCESS. NOT REVIEWED OR APPROVED FOR ANY BASEMENT BEDROOM. AP...
T/I - 6TH & 7TH FLOOR const type: IB occupancy: B 2020 MSBC occupant load: 71 (6TH), 80 (7TH) architect: 57258 - Eder, Jared Michael @ STUDIO BV
Remodel warehouse into cannabis cultivation and processing facility -ACW certificate of occupancy required no special inspections required no const type: IIB occupancy: F-1,B 2020 MSBC occupant load:...
(DMH - PDox) RECONSTRUCT 5'-4"x6'-6" CONCRETE LANDING AT FRONT OF SFD OVER 1 NEW PIER FOOTING. A FOOTING INSPECTION IS REQUIRED FOR EXISTING FOUNDATIONS OR NEW FOOTINGS TO VERIFY FROST DEPTH BEFORE IN...
replace front stoop and steps. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM TREAD ALLO...
BUILD NEW RAMP & RETAINING WALL AT EXTERIOR 2020 MSBC architect: 51553 - Laverdure, Michael Richard Lee @ DSGW
(DMH-Pdox) KITCHEN REMODEL IN SFD. FRAME CLOSED 1 WINDOW. RELOCATE WINDOW OVER SINK. OTHER MINOR INTERIOR WALL FRAMING. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. APPROVED PLANS AND P...
SUITE 950. INTERIOR TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no special inspections required: no const type: I-B occupancy: B 2020 MSBC occupant load: 66 sprinklered: yes Tenant: D...
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOW...
Add small powder room in basement. Addendum to previous permit application (BLDG1163002). Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Fuel-fired appliances shall not b...
DEMO EXISTING SHOWER TO INSTALL NEW TUB/SHOWER AND SURROUND AT EXISTING APPROX. 5'x7' BASEMENT BATHROOM. 6'-4'' MIN. FINISHED HEADROOM CLEARANCE MUST BE PROVIDED IN BASEMENT BATHROOMS AND AT BASEMENT...
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOW...
Replace rear deck boards, railings, and stairs Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Stairs: 7 3/4 maximum riser height, 10 minimum tread depth. Guards shall be...
Parking ramp repairs. phase 3 only. (jjl) type ia construction engineer: walker consulting - michael retterath #44637 special inspections: braun
Remodel portions of existing offices and Tech Bay -ACW certificate of occupancy required: no special inspections required: no const type: II-B occupancy: B, F-1 2020 MSBC sprinklered: yes Tenant: Niro...
Remodel existing main floor bathroom and create new 5'x10' bathroom in unfinished basement at sfd. 6'-4'' min. finished headroom clearance must be provided in basement bathrooms and at basement bathro...