HVAC Permits in Bronx, New York
243 hvac permits filed recently
243 permits
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
This application is filed for the installation of one (1) gas boiler in cellar
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Installation of one (1) new gas boiler in cellar
Replace oil burner on exisitng boiler.
This application is filed for the installation of one (1) gas boiler in cellar
Installation of one (1) new gas boiler in cellar
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Replace oil burner on exisitng boiler.
Replace six (6) existing 300 HP boilers with new, remove and install and connected accessories as per plans.
Replace six (6) existing 300 HP boilers with new, remove and install and connected accessories as per plans.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Install hvac system for 4 story residential building
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.