HVAC Permits in Bronx, New York
243 hvac permits filed recently
243 permits
Install hvac system for 4 story residential building
Filing herewith installation of the fuel storage and dispensers to serve the ems fleet and building emergency power generator as per plans in conjunction with nb application # 210181346. no change in...
Filing herewith installation of boiler as per plans inconjunction with nb application 210181346. no change in use, egress, or occupancy.
Filing herewith installation of the fuel storage and dispensers to serve the ems fleet and building emergency power generator as per plans in conjunction with nb application # 210181346. no change in...
Filing to remove existing peerless oil-fired boiler model# ect-e-04-175su with dob id# 62841 and also remove ex oil tank located at cellar fl. work as per plans.
Filing to remove existing peerless oil-fired boiler model# ect-e-04-175su with dob id# 62841 and also remove ex oil tank located at cellar fl. work as per plans.
Install new hvac as plan. no change in egress, use, or occupancy.
Modifications to hvac system for tenant fitout (suite 15 - csc store# 24076 / wtz store# s-906) as per plans filed herewith. no change in use, egress or occupancy under this application.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Installation of hvac system as per plans filed herewith in conjunction with nb #220607332.
Modifications to hvac system for tenant fitout (suite 15 - csc store# 24076 / wtz store# s-906) as per plans filed herewith. no change in use, egress or occupancy under this application.
Install new hvac as plan. no change in egress, use, or occupancy.
NYCHA BOILER_BLDG#4_Remove exist steam-fired DHWH exchanger. Remove and replace sump pump. Install new gas water heaters and storage tank, sump pumps, floor drains, and gas piping. Provide new water c...
Installation of new gas-fired hot water boiler
Install 2 temporary boilers in conjunction with previously approved subsequent filing -s4
NYCHA BOILERS_BLDG#5_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tanks, and new gas meter assembly and gas piping to gas water heaters.
Replacement of existing combination space heating & domestic water equipment w/ new dual burner steam boiler & gas fired hot water boiler + indirect heater.
Replacement of existing combination space heating & domestic water equipment w/ new dual burner steam boiler & gas fired hot water boiler + indirect heater.
Installation of new gas-fired hot water boiler
Install 2 temporary boilers in conjunction with previously approved subsequent filing -s4