HVAC Permits in Bronx, New York
243 hvac permits filed recently
243 permits
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Propose subsequent filing for installation of HVAC System in existing 5-story fully sprinklered building filed in conjunction with Alt-CO # X00870226-I1.
Propose subsequent filing for installation of HVAC System in existing 5-story fully sprinklered building filed in conjunction with Alt-CO # X00870226-I1.
Gas re-pipe to existing furnace.
removal of existing HVAC equipment - provide ventilation to the 7 fl west and south wing via installation of an AHU on the 8 fl MER and an RTU on the 11th fl and exhaust fan on 13th fl with ductwork d...
Js 123x, installation of temporary chimney, steam, condensate & makeup water piping to connect temporary boiler on behalf of contractor in conjunction with dob # 201204972. no change in use, egress, o...
removal of existing HVAC equipment - provide ventilation to the 7 fl west and south wing via installation of an AHU on the 8 fl MER and an RTU on the 11th fl and exhaust fan on 13th fl with ductwork d...
Installation of new boiler at cellar floor. no change to use, egress or occupancy. application previously filed & approved under x00490662-z1, however was filed as replacement instead of new installat...
Filing for Fuel Storage Tank for Generator.
Temporary natural gas and domestic cold water piping to serve temporary boiler as per plans.
Application to remove and replace (1) 550 gal. underground fuel storage tank with (1) new 250 gal. aboveground fuel storage tank. (No change in use, egress, or occupancy)
Installation of mechanical hood for existing kitchen. install new make air unit and new hvac equipment for ec 42. no change of use, egress or occupancy under this application
Installation of mechanical hood for existing kitchen. install new make air unit and new hvac equipment for ec 42. no change of use, egress or occupancy under this application
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.