HVAC Permits in Bronx, New York
243 hvac permits filed recently
243 permits
Replace oil boiler and burner. installation of four (4) - 330 gal. fuel oil tanks and abandon in-place the existing 5,000 gal. fuel oil tank. no change in use, egress or occupancy.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Replacement of air conditioning unit for the lobby area. No change in use egress and occupancy.
Replacement of air conditioning unit for the lobby area. No change in use egress and occupancy.
Replace oil boiler and burner. installation of four (4) - 330 gal. fuel oil tanks and abandon in-place the existing 5,000 gal. fuel oil tank. no change in use, egress or occupancy.
Temporary natural gas and domestic cold water piping to serve temporary boiler as per plans.
Replace bathroom fixtures on the first and second floor to existing roughing. install new washer and dryer on first and second floor. also install 1 boiler & 1 hwt ,no change in use, egress, and occup...
Temporary natural gas and domestic cold water piping to serve temporary boiler as per plans.
Interior reno:Bronx Family courtroom, dividing 2000SF room in 3 small hearing & Conf. rooms. Room at 2nd Fl-double ceiling, vinyl floor, HVAC & electrical system removal. Add new vinyl floors,ceiling,...
Ps 886x, installation of temporary boiler breeching and stack, steam, condensate, and make-up water piping submitting on behalf of the contractor in conjunction with dob # x01130125. no change in use,...
Ps 886x, installation of temporary boiler breeching and stack, steam, condensate, and make-up water piping submitting on behalf of the contractor in conjunction with dob # x01130125. no change in use,...
Interior reno:Bronx Family courtroom, dividing 2000SF room in 3 small hearing & Conf. rooms. Room at 2nd Fl-double ceiling, vinyl floor, HVAC & electrical system removal. Add new vinyl floors,ceiling,...
Hvac modifications associated with interior renovation of existing digital movie theatre auditorium 1 (dolby) as per plans filed herewith. no change in use, egress or occupancy.
Hvac modifications associated with interior renovation of existing digital movie theatre auditorium 1 (dolby) as per plans filed herewith. no change in use, egress or occupancy.
Installation of generator systems in conjunction with nb #x01048469-i1.
Installation of plumbing fixtures at first and second floor-installation of (2) combi boilers and new bathroom at cellar.
NYCHA BOILERS_BLDG#3_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas pipi...
Installation of plumbing fixtures at first and second floor-installation of (2) combi boilers and new bathroom at cellar.
Installation of generator systems in conjunction with nb #x01048469-i1.
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.