HVAC Permits in Bronx, New York
243 hvac permits filed recently
243 permits
The work consists of demolition of existing heating elements and installation of new hvac & bathroom exhaust system & ductwork for bronx river house as shown on the plan. no change in use or egress un...
Replace boiler and gas/oil burner.
Renovate existing part 1st floor commercial space for a new eating & drinking place for 'sonic'. install non load-bearing partitions, exterior wall finish, plumbing, kitchen equip, hood, exhaust & rep...
8939- Herewith filing for Replacement and modifications to existing HVAC system serving an existing retail space. No change in egress use or occupancy. Procert Requested.
Replace boiler and gas/oil burner.
Cnvrt steam equip to gas fired equip. rmve exist steam boiler, supply//return pipes, clg mntd space heaters, exist gas pipes, valves, cntrols, flues, rmve exist equip, etc. new gas fired clg mnted spa...
8939- Herewith filing for Replacement and modifications to existing HVAC system serving an existing retail space. No change in egress use or occupancy. Procert Requested.
Replacement of boilers and associated controls, combustion air, and flue.
The work consists of demolition of existing heating elements and installation of new hvac & bathroom exhaust system & ductwork for bronx river house as shown on the plan. no change in use or egress un...
Renovate existing part 1st floor commercial space for a new eating & drinking place for 'sonic'. install non load-bearing partitions, exterior wall finish, plumbing, kitchen equip, hood, exhaust & rep...
Mechanical work in conjunction with renovation of 18-story nycha multiple dwelling throughout: installation of new air-conditioning systems, replacement of ventilation systems and miscellanceous hvac...
Mechanical work in conjunction with renovation of 18-story nycha multiple dwelling throughout: installation of new air-conditioning systems, replacement of ventilation systems and miscellanceous hvac...
Boiler filing design includes the removal of (1) existing boiler and the installation of 1 new high efficiency boiler with exhaust and combustion ventilation air piping. no change in use, egress, or o...
Abandon existing buried 8,000-gallon fuel oil storage tank as per plans. no change in use, egress or occupancy.
Installation of (6) new gas fired boilers.
Restore gas service, repair riser, register furnace.
Associated mechanical work for replacement of three (3) boilers and three (3) gas/oil burners as per plans. no change in use, egress or occupancy.
Installation of (6) new gas fired boilers.
Boiler filing design includes the removal of (1) existing boiler and the installation of 1 new high efficiency boiler with exhaust and combustion ventilation air piping. no change in use, egress, or o...
Associated mechanical work for replacement of three (3) boilers and three (3) gas/oil burners as per plans. no change in use, egress or occupancy.