HVAC Permits in Bronx, New York
244 hvac permits filed recently
244 permits
Registration of a temporary trailer-mounted steam boiler, which will be used to provide steam for heating purposes when required on demand at NYCHA facilities.
Rehabilitation of existing hvac systems
Rehabilitation of existing hvac systems
Installation of new mechanical systems, equipment, fixtures, fittings and/or appurtenances, including heating, cooling, and air conditioning systems. no change to use, egress, or occupancy.
Installation of new mechanical systems, equipment, fixtures, fittings and/or appurtenances, including heating, cooling, and air conditioning systems. no change to use, egress, or occupancy.
This application is filed for the installation of 12 shower , 12 lavatory , 12 toilet , 14 sink , 2 hot water heaters , 2 boilers and 2 gas meters in conjunction with alteration application #x00973158...
This application is filed for the installation of 14 toilets , 14 lavatory ,14 shower , 13 sink , 1 dishwasher , 2 hot water heater , 2 gas boilers, 2 gas meters in conjunction with alteration applica...
This application is filed for the installation of 12 shower , 12 lavatory , 12 toilet , 14 sink , 2 hot water heaters , 2 boilers and 2 gas meters in conjunction with alteration application #x00973158...
This application is filed for the installation of 14 toilets , 14 lavatory ,14 shower , 13 sink , 1 dishwasher , 2 hot water heater , 2 gas boilers, 2 gas meters in conjunction with alteration applica...
Propose to install Two gas fired boilers @ cellar in conjunction with Alt 1 # 210181408,
Register tenant laundry washers and dryers. install new gas meter for tenant laundry. install new gas meter for apartment '1m' gas stove. install new gas meter for exisitng boiler pilot, new sprinkler...
Propose to install Two gas fired boilers @ cellar in conjunction with Alt 1 # 210181408,
Register tenant laundry washers and dryers. install new gas meter for tenant laundry. install new gas meter for apartment '1m' gas stove. install new gas meter for exisitng boiler pilot, new sprinkler...
Install new hvac units on existing steel dunnage and ductwork equipment as per plans/ no change or egress occupancy.
Relocation of existing HVAC equipment for new egress elements, includes HVAC units, ducts, and diffusers.
Replacement (2) new hot water low pressure boilers. replacement (2) new combination gas/oil burners. no change in means of egress use group or occupancy.
To register existing two boilers for two apts on second & third floors for heating & hwh.
To register existing two boilers for two apts on second & third floors for heating & hwh.
Install new hvac units on existing steel dunnage and ductwork equipment as per plans/ no change or egress occupancy.
Relocation of existing HVAC equipment for new egress elements, includes HVAC units, ducts, and diffusers.