HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Installation of Mechanical HVAC system including heating and cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with job# B00989327-I1
Nycha boilers-
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
Installation of Mechanical HVAC system including heating and cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with job# B00989327-I1
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Install new boiler exhaust vent per plans.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
Install new boiler exhaust vent per plans.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Remedy ecb violation#39166318n. file a plumbing work type to reconnect the existing gas line for the existing gas furnace at the 1st floor only. no change in use egress or occupancy under this applica...