HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans...
Installation of (1) air conditioner unit, (2) erv and minor mechancial work as per plan
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed...
Remove existing fuel oil storage tanks as per plans. no change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans...
Remove existing fuel oil storage tanks as per plans. no change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Installation of (1) air conditioner unit, (2) erv and minor mechancial work as per plan
install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed...
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Structural work filed in conjuction with the gc application: coordinate new mep penetrations, dunnage for plaza-supported outdoor boiler pod. no change in use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Nycha boiler - structural work for interior renovation replacing concrete pads and enlargement of existing sump pits.