HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Interior renovation of the existing apartment #16e. removal of non-bearing partition, new interior finishes, new ductless air conditioning system. no change in use, occupancy or egress.
Installation of the new concrete pads for mech. equipment in tank rooms and boilerroom. create new opening in the exterior masonry walls. new concrete area ways at tank rooms.
Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. related applications filed under b00458414, b00463465, b00461894
Renovation of existing cellar with plumbing work: install new boilers and hot water heaters on cellar as per plan; no change in use, egress or occupancy under this application
Filing for louver replacement, minor facade repair of existing masonry disturbed by louver replacement and pad extension related to boiler replacement/removal per plans filed. no change to use, egress...
As per dob inspector instructions, the subseq (-s1) is filed to remove administratively and put in void status the 5th tank (fs-00005925) that was approved under (-i1) but never installed/void during...
Installation of steam unit heater for boiler replacement. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Marlboro houses (building #29), the installation of temporary steam and condensate piping to connect (3) temporary boiler trailers to the existing building heating system to provide heat during the he...
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Marlboro houses (building #29), the installation of temporary steam and condensate piping to connect (3) temporary boiler trailers to the existing building heating system to provide heat during the he...
Proposed installation of new fire rated wall in cellar for the installation of a new direct vent boiler/water heater combo unit to serve apartment 1r on 1st floor.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.