HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Installation of new air conditioning system including related, somke detectors, smoke dampers, fans, ductwork, and piping.
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Replacement of air conditioning unit in the cellar MER. All existing ductwork to remain. No change in use egress and occupancy.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Supply and install boiler pod with (6) new gas fired condensing boilers furnished with all accessories and appurtenances. no change to use, egress or occupancy.
Mechanical (hvac) work for renovation of existing multifamily building. hvac contractor shall provide all labor, materials, equipment, hoisting, rigging, scaffolding, and services required to complete...
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Mechanical (hvac) work for renovation of existing multifamily building. hvac contractor shall provide all labor, materials, equipment, hoisting, rigging, scaffolding, and services required to complete...
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.
Replacement of air conditioning unit in the cellar MER. All existing ductwork to remain. No change in use egress and occupancy.
Supply and install boiler pod with (6) new gas fired condensing boilers furnished with all accessories and appurtenances. no change to use, egress or occupancy.
Install new HVAC.
Mechanical work in relation to Alteration Type I building enlargement. New HVAC (split-system), duct and exhaust work. Related mechanical piping.
Install new HVAC.
Register (2) existing boilers, (2) range/ovens and (2) dryers.
Mechanical application in conjunction with substantial rehabilitation of existing multiple dwelling building. hvac, kitchan and bathroom exhausts.
Install new gas piping from existing gas meter to new boiler.
NYCHA BOILER- BLDG # 5- Architectural work being filed in conjunction with Cooper Houses and all related applications.