HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Install (1) new HVAC split unit at first floor read one story area. No change in occupancy, use or egress or bulk under mechanical application.
Install (1) new HVAC split unit at first floor read one story area. No change in occupancy, use or egress or bulk under mechanical application.
Plumbing associated with boiler replacement
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Application file to interior renovation as sheetrock, floor tiles, ceiling, boiler room enclose and meter room repair by cmu block at cellar. remodeling steps at rear yard at cellar floor. remove viol...
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
In cellar remove 1 existing boiler & hwh, replace wiith 3 boilers and 3 hwh using approx.100ft.of 1''& 30 ft.of 3/4''black pipe.will upgrade 3 existing gas meter bars,all equipment vents thru existing...
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipmentroom.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
In cellar remove 1 existing boiler & hwh, replace wiith 3 boilers and 3 hwh using approx.100ft.of 1''& 30 ft.of 3/4''black pipe.will upgrade 3 existing gas meter bars,all equipment vents thru existing...
Direct replacement of all plumbing fixtures and 3 boilers. no change in use, egress or occupancy.
Provide split system air conditioning unit.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Replacing existing gas fired boiler in the cellar with new as per plans filed herewith. NOTE: This filing supersedes filing B00822455-I1.
Direct replacement of 3 gas boilers filing no change under use, egress or occupancy.
Replacing existing gas fired boiler in the cellar with new as per plans filed herewith. NOTE: This filing supersedes filing B00822455-I1.
Provide split system air conditioning unit.
Direct replacement of all plumbing fixtures and 3 boilers. no change in use, egress or occupancy.