HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Application file to install a boiler at cellar floor as per plan. no change in use, egress or occupancy under this application.
Install new central air condition system at existing 1-story building.
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Register existing boiler per ecb violation # 32067966n installed per laa 310345846
Install new central air condition system at existing 1-story building.
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Register existing boiler per ecb violation # 32067966n installed per laa 310345846
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Renovation of cellar mechanical equipment room - nycha boilers
Interior renovation of cellar, 1st & 2nd floor of existing 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
NYCHA BOILER - Plumbing work and associated piping for interior renovation.
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Renovation of cellar mechanical equipment room - nycha boilers
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Interior renovation of cellar, 1st & 2nd floor of existing 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Installation of new air conditioning units to provide cooling and heating to the building.