Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Partial demolition - removal of rear extension at basement, 1st thru 4th floors of existing bldg. in conjunction with alt type 1 filing #m01208264. no change to use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
Minor demolition: Removal of interior partitions, walls, doors, suspended ceilings, flooring and finishes on the 21st Floor as per plans (HighLife - Demo Phase.) No change to use, egress or occupancy.
Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans filed herewith.
Demoliton and replacement of 1300sqft existing vaulted concrete slab sidewalk and topping slab. no change to use, egress or ocupancy
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes and sidewalk repair on the Cellar & 1st floors (Harry Winston -Fitout) as per plans. No change to use, egre...
Herewith, please find the filing for interior demolition, which includes the removal of partitions, ceilings, floors, and fixtures throughout. There will be no changes to use, egress, or occupancy.
Perform minor interior partition demolition & construction. reconfigure entry vestibule & sitting room. replace entry door and frame to match existing. install new lighting at entry vestibule & sittin...
Filing herewith interior demolition and renovation to the 13th FL. as per plans filed herewith. No change to use, egress occupancy.
Herewith, please find the filing for interior demolition, which includes the removal of partitions, ceilings, floors, and fixtures throughout. There will be no changes to use, egress, or occupancy.
Demoliton and replacement of 1300sqft existing vaulted concrete slab sidewalk and topping slab. no change to use, egress or ocupancy
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes and sidewalk repair on the Cellar & 1st floors (Harry Winston -Fitout) as per plans. No change to use, egre...
Demolition and general construction work on partial 22nd floor as per plans. No change to use, egress or occupancy.
Filing herewith interior demolition and renovation to the 13th FL. as per plans filed herewith. No change to use, egress occupancy.
Perform minor interior partition demolition & construction. reconfigure entry vestibule & sitting room. replace entry door and frame to match existing. install new lighting at entry vestibule & sittin...
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Legalization of demolition work completed under emergency work order Control No. 337386, Violation Number FEU10601FF
Filing to remove and demolish (5) existing 60-ton chillers along with all associated piping, and installing (2) new 180-ton modular chiller banks along with all associated piping. no change to use, eg...
Partial and interior demolition of 11 story building as per plans filed herewith.
Filing to remove and demolish (5) existing 60-ton chillers along with all associated piping, and installing (2) new 180-ton modular chiller banks along with all associated piping. no change to use, eg...