HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Installation of three (3) new boilers, burners, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Mechanical filing subsequent to gc filing - design includes the installation of air conditioning system. no change in use, egress, or occupancy under this filing.
Work includes the heating, ventilation, and air conditioning space as purposed in plans.
Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
HVAC system for Apartment #8W on the 8th floor. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Installation of (1) outdoor condenser unit and (5) indoor air handling units for a split hvac system, including ductwork, diffusers, condensate drains, refrigeration piping with insulation, and flexib...
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Replace existing HVAC riser sets including associated insulation, wall / soffit openings, restoration, & access doors. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Ps 009m, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction with dob # 103652370. no change in use, egress, or occupancy...
Removal mechanical/hvac components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Removal mechanical/hvac components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Replace existing HVAC riser sets including associated insulation, wall / soffit openings, restoration, & access doors. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.