HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
ERIOR RENOVATION OF UNIT 2E INCLUDING REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS IN THE KITCHEN AREA AND INSTALLATION OF NEW STEPS LEADING TO THE SUNKEN LIVING ROOM, installing new split HVAC as...
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Proposed installation of HVAC units, exhaust duct, SS Hood, and exhaust fan, including all incidental general construction work associated with the mechanical installation.
Modify existing conditions for the installation associated with the new Boilers to be installed, cut,patch,paint, all to match existing as per plans.
Installation of new HVAC equipment and ductwork
Modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy.
Herewith filing boiler and tank removal as per plans. no change in use, egress or occupancy
Modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy.
Installation of new HVAC equipment and ductwork
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
ERIOR RENOVATION OF UNIT 2E INCLUDING REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS IN THE KITCHEN AREA AND INSTALLATION OF NEW STEPS LEADING TO THE SUNKEN LIVING ROOM, installing new split HVAC as...
Proposed installation of HVAC units, exhaust duct, SS Hood, and exhaust fan, including all incidental general construction work associated with the mechanical installation.
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Herewith filing boiler and tank removal as per plans. no change in use, egress or occupancy
Installation of steam and condensate piping to two temporary boilers as per plans filed herewith.