HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Modifications to existing Mechanical/HVAC System and ductwork related to Guestrooms renovation.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, occupancy or egress
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting throughout, no change to win...
Northwell Lenox Hill Biplane Project: modify HVAC system to conform with new layouts as per plans filed herewith.
Decouple existing hot water system from steam boiler and replace it with new natural-gas-fired condensing water heaters
2 Boiler installation in conjunction with Alteration
Proposed hvac improvements as per plans. no change to use, egress or occupancy
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting throughout, no change to win...
Installation of steam and condensate piping to two temporary boilers as per plans filed herewith.
Northwell Lenox Hill Biplane Project: modify HVAC system to conform with new layouts as per plans filed herewith.
Modifications to existing Mechanical/HVAC System and ductwork related to Guestrooms renovation.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, occupancy or egress
2 Boiler installation in conjunction with Alteration
Proposed hvac improvements as per plans. no change to use, egress or occupancy
Mech work related to renovation of existing commercial space Installation 8 ton split HVAC units with ductwork & 1 bathroom exhaust fans & ductwork
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Application filed to install new mini split hvac units. all as per plans filed herewith.