HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Boiler replacement in kind
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Application filed to install new mini split hvac units. all as per plans filed herewith.
Replacement of ductwork for existing HVAC units.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Boiler replacement in kind
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Install HVAC unit for chase bank.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
modification & additions to existing 1st floor hvac systems and new cellar commercial cooling and hood exhaust systems as indicated on plans.
Existing gas piping connecton to replacement boiler.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Install HVAC unit for chase bank.
Existing gas piping connecton to replacement boiler.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy