HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Re-install additional gas dryer off existing future tee connection and repair dryer venting in response to violation # 039145853m. file for gas connection to replacement gas boiler in response to viol...
Modifications to the existing HVAC system on the 6 & 7 Floors as per plans. No change to use, egress or occupancy.
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Modification of existing HVAC system on the 33rd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
Modifications and additions to the existing HVAC system on the 14th and 17th Floors (ICBC), including modifications of ductwork and piping, and the addition of water source heat pumps as per plans. No...
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Heating, ventilation, and air conditioning work as per the architectural layout.
Replace gas-fired hot water boiler with hot water heater and connect to existing gas piping as per plans. no change in use, occupancy or egress
NYCHA BOILER-CARVER_BLDG #5_Provide a temporary boiler plant to serve the existing facilities during demolition of the existing boiler plant and construction of the new facility boiler plant.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
Replace air conditioning unit.
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.
Replace gas-fired hot water boiler with hot water heater and connect to existing gas piping as per plans. no change in use, occupancy or egress
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
Heating, ventilation, and air conditioning work as per the architectural layout.
Modifications and additions to the existing HVAC system on the 14th and 17th Floors (ICBC), including modifications of ductwork and piping, and the addition of water source heat pumps as per plans. No...
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.