HVAC Permits in Manhattan, New York
1,061 hvac permits filed recently
1,061 permits
Installation of new thru-wall air conditioning units, new central split mechanical system & related ductwork; new toilet, dryer & rangehood exhaust, as per plans filed herewith.
Install replacement burner as per plans. filed in conjunction with laa# m01114839-i1-la. no change in use, occupancy or egress.
Installation of new hvac air-conditioning heat pump split system for ground floor retail teant c
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
Design heating, ventilation and air conditioning system with ductwork, piping and controls. No change in use, occupancy or egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01360220 as per plans filed no change in use occupancy or egress
Replacement of HVAC equipment (Vacum pump, condensate pump)
Install new air conditioning systems (heat pumps), ventilations systems and heating systems
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Design heating, ventilation and air conditioning system with ductwork, piping and controls. No change in use, occupancy or egress.
Installation of new thru-wall air conditioning units, new central split mechanical system & related ductwork; new toilet, dryer & rangehood exhaust, as per plans filed herewith.
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
replace existing ducts with new layout on existing existing HVAC system on portion of the 13 floor (marketed as 14) in conjunction with Alt # M01355130 as per plans filed
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01375269 as per plans filed no change in use occupancy or egress