3,402 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,402 permits
Mechanical work as per plans filed. application filed in conjunction with new building 121208095.
AT&T - Installation of gas line from basement to roof routed along rear of building in existing conduit (10097550) as per plans. Installation of gas meter in the basement. No chang…
Installation of suspended scaffold for facade work or inspection
Herewith filing to update C of O description of use for existing 5 story commercial building and minor work to entry closet. No change to egress.
Temporary Enclosure System for Louver Work
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Alteration for interior work to non-bearing partitions at first floor. no change of bulk, use, occupancy, or egress.
Filing for plumbing and sprinkler work associated with interior renovation of 17th & 18th floors thomson reuters office as per plans
Mechanical modifications taking place on the 15th floor (16th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Interior renovation at 1st floor beauty salon and cellar of existing 14-story building with general construction work as per plan filed herewith. related plumbing work will be file…
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Structural modifications taking place on 17th and 18thfloors as per plans filed herewith. No change in egress, use, or occupancy
Remove all mech equipment, and associated apparatus.
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under th…
Replacement of existing HVAC unit for first floor (Fedex Store) of premises. No change in use, egress or occupancy under this application.
Modification to existing mechanical system on the 8th floor as per drawings filed herewith. no change to use, occupancy, or egress
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1.…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.