3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
Plumbing and sprinkler modifications to accommodate alterations within the existing building as per plans.
Renovation to existing space on 2nd floor. no change to use, occupancy or egress.
Plumbing modifications taking place on the 29th fl Con/30th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Roofing replacement above structural deck as per plans filed herewith.
Sprinkler head changes as indicated on plans.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Filed for interior renovation of commercial space located on the ground floor remove/replace non-bearing partitions & finishes as per plans; no change to use, egress or occupancy.
General construction modifications on the 19c/20m floor as per plans filed herewith. no change of use, egress or occupancy.
structural work associated with the apron extension for the run of the Broadway Show, Death of a Salesman, as shown on plans filed herewith. no change to use, egress or occupancy.
Interior removal fit out for Bank of America.
Support of excavation for the construction of a new building as per plans filed herewith.
sprinkler modifications on 18th floor as per plans filed herewith. no changes in use, egress or occupancy.
Plumbng system installation for proposed medical office space as per plans, herewithin filed in conjunction with gc application no. m01193571-i1. no change in use, egress or occupa…
The pipe scaffold top of the sidewalk shed ( permit by other) to the setbacks to the 19th floor setback at west and south elevation broadway.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Install new temp loop for cellar & 1st floor as per plans. no change to use, occupancy or egress.
Structural work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Sprinkler modifications taking place on the 15th floor (16th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Install new awning with canvas cover at storefront reading the best sichuan as per plan. no change in use, egress, and occupancy.
Modification to existing plumbing system as per drawings filed herewith. no change to use, occupancy, or egress