2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Suspended scaffold installation for facade repairs and inspections
Modifications to the existing plumbing system on the floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy
Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.
Interior demolition and construction of non-load bearing partitions, finishes, fixtures as per plans. No change to use, egress or occupancy.
Hereby filing for related mechanical work for proposed alteration.
Construction of interior partitions, doors and ceiling for new office conference room. New convenience stair as shown on drawings. No change in use, egress or occupancy,
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Use of Building Maintenance Unit (BMU) #4, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
Remove 51 sprinkler heads and piping & install 48 new sprinkler heads and piping.
Structural work in Penthouse as per plans filed. No change in use, occupancy or egress.
Modifications to the existing sprinkler system on the (41st floor-Tiger) as per plans. No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Rest…
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egre…
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.)…
Work to commercial space at the 1st floor of a 23 story, commercial building. alterations to include interior commercial fit-out work. no change to zoning, use, egress, or occupanc…
Installation of temporary contractor shed as per plans.