2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Construction of interior partitions, doors and ceiling for new office conference room. New convenience stair as shown on drawings. No change in use, egress or occupancy,
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egre…
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.)…
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Filing for General Construction as per plans submitted. No change in egress, use, or occupancy.
Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Hereby filing for new fixtures and piping for renovation of existing building. no change to use, egress or occupancy.
Remove plumbing and sprinkler fixtures.
General construction for ING Financial on 10th and 11th floor
Interior plumbing work as shown on filed plans
Install new plumbing fixtures: (2) WCs, (2) Lavatories, (2) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and associated CW/sanitary piping on the Cel…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Installation of an illuminated accessory business wall sign. reading: pub connolly's. the project falls within times square subdistrict core.
Removal & installation of plumbing fixtures and related plumbing. no change to use, egress or occupancy.
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Plumbing Fixture changes as indicated on plans.
Replacement of existing sprinkler service fire pump in kind capacity.
Filing herewith mechanical work on existing 7th floor space, United Health Fund. No change in use, egress or occupancy.
Erect a non-illuminated, accessory business awning for five guys @48th street elevation as per drawings file herewith.