3,426 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,426 permits
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Structural work filed in conjunction with renovation of existing hotel; addition of cellar mez level.
Modification/addition to existing standpipe system as shown on drawings. No change in use, egress or occupancy.
Combination of apartment 3503 and 3505. Installation of partitions with wall and floor finishes. No change of use, egress or occupancy under this application. Work will comply with…
The proposed tenant improvement work is within a fully-demised / fire-rated office tenant space located on the 22nd floor. new interior partitions, ceilings, flooring, millwork and…
Ttd -const. fls: 24 & 39 / marketing fls: 26 & 41 - filing herewith for installation of one fire hose cabinet as shown on plans. there will be no change of use, occupancy or egress…
Plumbing and Sprinkler Demo and installation of Temp Sprinkler Loop on the 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Propose installation of new plumbing fixtures, sprinkler heads and associated sprinkler branch piping. No change to use, egress or occupancy.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Ttd - const. fl 40 / marketing fl 42 - filing herewith for installation of fire hose cabinet as shown on plans. there will be no change of use, occupancy or egress under this appli…
Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy.
Temporary system scaffold platform as per drawings. system scaffold platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Propose to perform interior renovations. No change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Modify existing commercial cooking equipments and piping at 001, as per plans, no change in use, egress or occupancy
Installation of pipe scaffold towers at interior floor slabs as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…
Ttd - const. fl 42 / marketing floor 44 - filing herewith for the installation of one fire hose cabinet as shown on plans. there will be no change of use, occupancy or egres under…