3,426 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,426 permits
Structural modifications taking place on the the 32nd Fl construction 33rd marketing floor as per plans filed herewith. No change in use, egress or occupancy
Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy.
General construction taking place on sub-cellar #1 (b-2 marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Ttd - const. fl 40 / marketing fl 42 - filing herewith for installation of fire hose cabinet as shown on plans. there will be no change of use, occupancy or egress under this appli…
Propose to perform non-structural demolition, remove partitions, plumbing fixtures, floor finishes, ceilings, light fixtures, ductwork, millwork and cabinets. No change to use, egr…
Plumbing work in partial 22nd floor as per plans. No change to use, egress or occupancy.
Removal of sprinker system and conversion of standpipe system to dry pressurized system in assoasition with full building demolition, by others. there is no change to use, egress,…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Sprinkler modifications taking place on the 6 Floor as per plans filed herewith. No change in use, egress or occupancy
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.
Herewith Modification to existing Mechanical Systems in connection with renovations of existing offices and as per plans.
Remove ex. 90 ton chiller & 2 air handlers. install 2- 60 ton chillers w/ 2 new air handlers. install pumps w/ piping modifiactions. install 10 ton hp w/ 10 air handlers. 2- 5 ton…
Herewith filing plumbing scope of work in connection with establishment of new place of assembly.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary scaffold enclosure as per plans. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 53rd floor (unit 53c) as per plans filed herewith. no change in use, egress,…
Suspended scaffold installation off C-hooks and outriggers as per plans filed herewith.