3,392 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,392 permits
Suspended scaffold outrigger system for exterior facade restoration work at 135 west 36 street, manhattan, ny 10018
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Plumbing fixtures and piping modification as per drawings filed herewith. No change to occupancy, use, or egress.
Mechanical work as shown on plans filed herewith.
Facade repairs, scaffold inspections, 3 men letter
Modifications to the existing plumbing system on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Renovations to existing retail store. removal of interior wall cladding and millwork. replace with new drywall system as per plans filed herewith. no change in use, egress or occup…
Modification to existing mechanical system and related piping. installation of new a/c units as shown on drawings. no change to use, egress or occupancy.
Removal and installation of partitions, ceilings, doors and finshes as shown on drawings. no change to use, egress or occupanyc.
Installation of temporary suspended scaffolds on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with…
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Sp work filed in conjunction with dob now gc, pl and mh. no change to use, occupancy or egress.
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
Plumbing and Sprinkler modifications on floors Sub-Cellar and Cellar, 01, 02, 03, 04, 09, 10 as per plans filed herewith. No changes in use, egress or occupancy.
Removal of interior non-load bearing partitions at first floor retail space. no change in use, egress or occupancy under this application.
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.
Plumbing modifications as per plans filed herewith. no change to use egress or occupancy.
Use of temporary platform/material hoist as per plans filed herewith.