3,392 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,392 permits
Removal and installation of plumbing fixtures with associated piping as per plans. No change to use, egress or occupancy.
Preparation Work for Full Demolition - Removal of Glass Windows
Installation of temporary suspended scaffolds on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with…
Modifications to the existing plumbing system on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Plumbing fixtures and piping modification as per drawings filed herewith. No change to occupancy, use, or egress.
Removal of interior non-load bearing partitions at first floor retail space. no change in use, egress or occupancy under this application.
Plumbing modifications as per plans filed herewith. no change to use egress or occupancy.
Mechanical modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Sp work filed in conjunction with dob now gc, pl and mh. no change to use, occupancy or egress.
Modification to existing mechanical system and related piping. installation of new a/c units as shown on drawings. no change to use, egress or occupancy.
Mechanical work as shown on plans filed herewith.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Renovations to existing retail store. removal of interior wall cladding and millwork. replace with new drywall system as per plans filed herewith. no change in use, egress or occup…
Install 8' ht construction fence aligned with property and work in-conjunction with alt2#m01355776. no change of use, egress, or occupancy under this application.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Interior Demolition interior partitions, doors, ceilings and flooring.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Installation and modification of plumbing fixtures and sprinkler heads with pipes.