3,342 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,342 permits
Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, e…
Partial Demolition of East Facade to create access opening for construction hoist
Interior renovation existing commercial space with plumbing work on 1st floor and mezzaine. no change in use, egress or occupancy.
Existing apartment renovation including partitions, finishes, and appliances. no change in use, egress, or occupancy.
Modifications to mechanical systems as per plans filed herewith filed in conjunction with NB #M00505081. No change of use, occupancy or egress.
Modification to Plumbing and Sprinkler Systems as per plans filed herewith.
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occu…
Filing for facade restoration purposes only. no change to use, egress or occupancy.
Install supported scaffold on the sidewalk shed in the front
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Interior renovation of existing apartment apt 602. no change no change of use, egress or occupancy.
Mechanical work for Akin Gump space on floors 41-45.
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per plans (Lowenstein Sandler LLP - Renovation…
Installation of temporary system scaffold as per plan. no change in use, egress, or occupancy.
Replacement of the residential cooling tower and condenser water piping. no change to use, egress, or occupancy.
Interior renovation of existing office space on the 14th floor; includes installation of interior non-load bearing partitions and finish work as per plans. No change to use, egress…
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 15th, 16th, 17th, & 18th floors as per plans filed herewith. no change in use,…
Plumbing modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress oroccupancy