3,358 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,358 permits
Mechanical modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Herewith filing for interior renovation of existing retail store as per plans.
Installation of plumbing fixtures and commericial cooking equipment for take out pizzeria
Fit-out of a 6,000 sf (approximate) office space including but not limited to the construction and installation of interior partitions wall for office space and finishes in 15th fl…
Filing herewith mechanical work in conjunction with renovation of exisitng office as per plans. no change in use, egress or occupancy.
Plumbing and sprinkler work related to the interior renovation of existing commercial space on the second floor. no change in use, egress, or occupancy.
Replace existing non-illuminated sign (neuberger)
Sprinkler modifications taking place on the 13th and 14th floor ( 12a and 13th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy
Interior work as per plans. No change in egress use or occupancy
Plumbing work associated with renovation of apt 27h, including replacement/relocation of toilets, lavs, showers, tub, sink, and washer/dryer as per plans submitted herewith. no cha…
Structural infill of floor openings, structural reinforcing and stair structure on the 35th- 37th Floors, as per plans. No change to use, egress, or occupancy.
Modification to existing sprinkler and plumbing systems and installation of new fixtures and sprinkler heads. No change in use, egress or occupancy.
Plumbing Fixture changes as indicated on plans.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Filing herewith plumbing modification and installation of fixtures and associated piping as per plans.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th f…
Replacement of the terrace doors on 10th floor as per plans. No change to use, egress or occupancy.