2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Modification to existing pluming fixtures and related piping as shown on drawings. no change to use, egress or occupancy/
Installation of curtain wall, storefront and adjacent metal cladding as per plans filed herewith. No change in use, occupancy or egress.
Interior renovations to existing apt. #11G. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or o…
Installation of new interior finishes, lighting, glass guardrail at perimeter curtain wall.
Replace some existing plumbing fixtures with new, and install some new. All as per accompanying plans. No chance in use or occupancy.
Filing herewith renovation of existing office as per plans.
Mechanical work on the 15th floor. no change to use, egress or occupancy.
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Filing herewith mechanical work as per plans for office renovation.
Renovation of existing commercial space on partial first floor with plumbing work: new hand sink, 3-comp. sink and ice maker in 1st floor as per plan; no change in use, egress or o…
9th Cycle FISP repairs. No change to use, occupancy or egress.
Mechanical modifications as per plans filled herewith. No change in use, egress or occupancy.
Reinforcement at 30th floor to accommodate increased live load as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing plumbing system on the 14th & 17th Floors (ICBC) as per plans. No change to use, egress or occupancy.
Foundation work related to enlargement of existing 8-story buidling to add 8 floors & new roof. application filed in conjunction with m01003551-i1 (alto co)
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.