1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
DevHUB Consultation 7.18.2025. Temporary bracing in conjunction with Alt CO M01262427-I1.
Temproary plywood construction fence 33l.f. x 10ft high, in conjunction with m01374650 (gc) storefront application. no change to use, egress or occupancy.
Interior renovation of 1st floor lobby, exercise room, recreation room and corridor. renovate hallway and flight elevator lobby from 2nd to 20th floor. scope of works as shown in p…
Interior renovation at existing dwelling 5/6c. new partitions for closets, new drop ceiling in primary bedroom, new wood floors in foyer. refinish floors. new millwork . no change…
Installation of temporary construction plywood fence. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
Perform minor interior partition demolition & construction work inconjunction with 6th floor apartment renovation. reconfigure kitchen, bathrooms & powder room. install & modify cl…
Plumbing scope of work: new, replaced & relocated fixtures as per plansfiled. no change to use occupancy or egress
Herewith filing for interior renovations of apartment 1c as per plans. no change to use, occupancy, or egress.
Proposed non-structural modification of unit 12E including removal and replacement of the kitchen, modification of 2 bathrooms, and modification of finishes throughout. No change i…
Replacement of the fixtures as per drawings, Master Bathroom - New Tub, redone existing Shower; WC and Lav replaced. Bath 2 - removal of tub, and bidet, new shower; Lav and WC repl…
Installation of 165' new sidewalk shed at 40 e 80th st as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Temporary structures for an LV event. Removed at the end of the programing. No changes to existing structures, use or egress.
SHED installation as per plans filed herewith.
Installation of temporary stair tower as per plan. no change in use, egress, or occupancy.
Installation of suspended scaffold during facade inspection/repair with Hoist.
Filing to replace waterproofing at roof membrane only as well as Repair/replace terrace paver at Penthouse, all as per plans. No change in use, egress, or occupancy under this appl…
Interior structural work in apt 1a and cellar, including framing of new wall and floor openings. no change to use, egress, or occupancy.
Renovation of one family residence. minor partition work. kitchen and bathroom renovation
Filing for mechanical work in conjunction with alt1 filing as per plans filed herewith.
Minor plumbing work related to apartment renovation. No change to use, egress or occupancy.