2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or…
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment fil…
Disconnect and removal of existing plumbing fixtures at various locations. Furnish and install new plumbing fixtures and associated piping at various locations.
General Constructions plans filed herewith to show interior renovations for apartment 12A. No change to use, egress, or occupancy.
Suspended scaffold outrigger system for exterior facade repair work at 188 east 64th street, manhattan, ny 10065
Partition, finish, fixture work in part of existing duplex dwelling unit. No change to use, egress or occupancy under this application.
Replace existing rooftop mechanical equipment. replace existing interior air handlers and humidifiers, and assoicated piping. no change to use, egress or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Modify existing sprinkler heads in coordination with the new reflected ceiling plans.
Perform demolition of existing plumbing fixtures. furnish and install new plumbing fixtures and fittings at bathrooms and kitchen. perform plumbing modification work in conjunction…
Interior renovation of apartment 2d on the 2nd floor. no change in use, egress or occupancy.
Facade alteration as per plans. No change to egress, use, or occupancy.
Installation of plumbing fixtures for medical office as per plans filed herewith. No change in use, egress or occupancy under this application.
Filing hrewith plumbing work on the 5th floor to remove existing classroom laboratories and associated fixtures and provide new lab sinks, sinks, emergency showers, and gas connect…
Renovation & partition reconfiguration of existing 2nd & 3rd floor. removal of housekeeping apartment on 2nd floor & conversion to business use on entire 2nd floor.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Filing for the plumbing work in conjunction with the renovation of the Apt# PHB.
Interior renovation of apartment phw on the 15th floor. no change to use, egress, or occupancy..
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Interior renovation, ptac unit replacement, new condenser and ptac unit below window, new air handler in apt. #3b. no change of use, egress or occupancy.