1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
T-Mobile: Installation and removal of equipment cabinet in the equipment platform on the roof. Replacement and relocation of antennas, and removal of RRUs on the roof. All work is…
Installation of temporary suspended scaffold equipment.
Interior renovation of 1st floor lobby, exercise room, recreation room and corridor. renovate hallway and flight elevator lobby from 2nd to 20th floor. scope of works as shown in p…
Plumbing modifications in APT 6A, as per plans filed herewith. No change in use egress or occupancy.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Interior renovation of existing office space on the 17th floor as per plans. no change in use, egress or occupancy.
Minor Plumbing work related to Interior renovation of existing apartment 19J. No change to use, egress or occupancy.
Installation of new partitions, ceiling lighting and millwork as well as new finishes. no change to use, egress or occupancy is proposed under this application. filed in conjunctio…
New air conditioner for apartment apt. 5d at 5 th floor
Replacement of one (1) ptac unit at existing sleeve in facade, and one (1) ptac unit at new facade opening are rear.
HVAC Unit replacements. All existing ductwork and piping to remain. No change in use egress and occupancy.
HVAC installation of apartment 15B. No change in use, egress, or occupancy.
Installation of temporary construction plywood fence. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
Replace existing residential washing machine and branch piping at existing location/laundry room at 6th floor of duplex dwelling unit 5/6C, No change to use, egress or occupancy.
Plumbing scope of work: new, replaced & relocated fixtures as per plansfiled. no change to use occupancy or egress
Relocation of sp heads and installation of new as per plans of domestic.
Herewith filing for modifications to the plumbing fixtures in units 5c and 14g as per plans. no change to use, occupancy, or egress.
Repair facade.
Hereby filing for the interior renovation of unit #3c (3rd floor) in a mixed use cooperative building. new interior partitions, finishes and millwork. new plumbing and electrical w…
Temproary plywood construction fence 33l.f. x 10ft high, in conjunction with m01374650 (gc) storefront application. no change to use, egress or occupancy.