1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Application filed to obtain an certificate of occupancy from a Multiple dwelling to a 1 (One) family dwelling. Work includes renovation of partitions, ceilings and finishes as per…
Renovation of existing Doctor's Offices. Reconfigure layout. Installation of split unit.
Filing for the modification of the mechanical system for the installation of AC units, PTAC units and ductwork related to the 6th floor apartment 6D renovations.
New plumbing work as indicated on drawings. no change of use, occupancy, egress or zoning this application.
Underpinning work in conjunction with SOE # M00704127-I1.
Cap and removal of the existing gas boiler as per submitted plans. No change in use, occupancy or egress.
Facade and roof repairs as per plans filed herewith. no change to use, egress or occupancy
Installation of suspended scaffold for facade work or inspection.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Plumbing word filing in conjunction of apartment #8A renovation
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy
Renovation of an existing apartment# 3E on the third floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change change to use,…
Filing plumbing work associated with alteration type II for interior renovation to Apt. 12D. No change in Use, Occupancy, or Egress under this application.
Filing for the interior renovation of apartment 6D to include removals and installation of non-load bearing partitions, flooring. ceilings, lighting and millwork.
Mh work filed in apt 3a filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Plumbing work proposed for an existing penthouse dwelling unit as per plans filed herewith. no change to use, occupancy or egress
Plumbing work is proposed for unit #10H on the 10th floor. A subsequent plumbing application will be filed. All work is in accordance with the submitted plans. There are no changes…
Installation of the new electrical boiler as per submitted plans. No change in use , occupancy or egress.
Renovation proposed for an existing apartment. No change of use, occupancy or egress.
Blank street coffee-- plumbing modifications and installations in conjunction with cafe build out.