1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Blank street coffee-- plumbing modifications and installations in conjunction with cafe build out.
Install new low pressure steam boiler and new combination nat gas/#2 oil burner in conjunction with replacement boiler filed under m01244818-i1. no change in means of egress use gr…
Renovation of apt 3a filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
minor mechanical work file in conjunction with apartment renovation.
Filing herewith drawings to propose an interior renovation of existing apartment # 7f. this application do not require a new or amended certificate of occupancy as there is no chan…
Blank street -- modifications to existing sprinkler system in conjunction with cafe buildout.
Temporary Installation to be used on a temporary event Park Ave Synagogue Tent. All the Installations are to be removed upon completion of the event.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of plumbing fixtures as per the drawings filed herein. filed in conjunction with gc #m01358190-i1
Replace (2) gas-fired boilers as per plans. no change to use, occupancy or egress
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
interior demolition of cellar through 5th floors. No strutural demolition.
Subsequent document for plumbing work in conjuction alteration # m01227462-i1. in 15th floor unit 15a & 15b, work to include cap and removal and new installation of plumbing fixtur…
Installation of material only hoists as per drawings. hoists shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Mechanical work filed in conjunction with apartment renovation on the 8th Floor.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
HVAC system replacement / upgrade in residential duplex apartment including new air-cooled chiller; fan-coil units; ductwork; humidification and exhaust fans. No change to occupanc…