2,092 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,092 permits
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Brick replacement, steel lintel replacement, terracota replacement with precast concrete, terracotta patching, installation of helifix pins, window sill replacement. no change in u…
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or…
Install new air conditioning systems (heat pumps), ventilations systems and heating systems
Filing herewith for the modifications to existing plumbing systems as per plans filed
Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 11 on the 011 floor. no change in use, occupancy, or egress.
Architectural changes on the 9th floor as indicted on drawings.
Plumbing work related to apartment renovation as per plans filed herewith.
Interior architectural modifications to duplex unit 9c/10c as per plans. no change to use, egress or occupancy.
Provide temorary core sprinkler protection (tcsp) in accordance with nycbuildings bulletin 2020-012.
Filing for the renovation of unit 10a at the 10thfloor. work includes removal and installation of interior nonload bearing partitions, doors, finish work. no change to use,egress,…
Filing for mechanical work at unit 10A on the 10th floor. No change to use, egress, or occupancy.
Plumbing work in conjunction with renovation of apartment #5d on 5th floor.
Non-illuminated non-advertising accessory storefront awning approved under landmark docket lpc-26-06498 - reinstein ross. no change of use, egress or occupancy.