1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Convert closets to powder room and laundry closet. Relocate an interior door. Seal door between kitchen and existing dining room.
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Proposed new horizontal and vertical enlargement of existing two-family house with general construction. the house as proposed will be a one -family & 5-story building. all related…
Work involves partition removal and construction. new interior doors and new finishes. no change of use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Partial interior renovation and combination of existing apartments on 9th floor in compliance with ttpn 03/97. no change to use, occupancy or egress
New steel framed rear addition, new steel framed elevator shaft, additionally various existing floors and floor framing structure will be replaced with new cold formed metal joists…
File suspended scaffold outrigger systems for facade restoration and inspection.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Plumbing work associated with interior renovation of Apartment 7B.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Temporary sidewalk construction storage enclosure located at the front of the building.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 60th street and 5th avenue elevations.
Store front demoliition as indicated on plans filed herewtih. no change in use, egress of occupancy under this application
Remove interior partitions, finishes, lighting fixtures, & non-structural walls,
Installation of temporary sidewalk shed as per plan. there is no change in use, egress,or occupancy. the sidewalk shed is in front of the building at east 86th street elevation.
Associated foundation work for new steel framed rear addition, new steel framed elevator shaft.
Mechanical work file in conjunction with the renovation of an existing apartment#9F of the ninth floor.
Remove and replace existing glass enclosure at existing sunroom. No change in occupancy, use or egress.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…