1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Plumbing plans filed herewith to show interior alteration within tenant space (Suite 11). Hot Water Heater, New PL fixtures and piping, & New dental plumbing fixtures and piping. N…
Remove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.
Hereby filing for the interior renovation work for apartment 30f (installation of plumbing fixtures). no change in use, egress or occupancy.
Plumbing work related to the interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Plumbing work in conjunction with apartment renovation (Unit 7)
Renovation of an existing dwelling unit. Architectural work as per plans. Mechanical and plumbing work as per plans. No change of use, occupancy or egress.
Replacement of fixtures at kitchen and bathroom. Add a washing machine at kitchen.
Filing to install outrigger on the roof for facade work.
Altco filed for change of use of multiple dwelling building to a one family as per plans filed herewith.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed for Minor furring on 1 & 2; combining units on the third floor and correct certificate of occupancy.
Installation of temporary storage of materials as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Interior renovation of an apartment PH16 to include removal and installation of partitions, doors, and millwork associated with the GC work scope. No change is use, egress, or occu…
Installation of temporary supported scaffold per plan submitted. Scaffolding associated with the following job numbers M01194927-I1 and M01194927-S1. Work shall comply with 2022 bu…
Interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Steel repairs in conjunction with Facade repairs filed under job# M00968463-I1.
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and paint…