1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Steel repairs in conjunction with Facade repairs filed under job# M00968463-I1.
Replace (2) new low pressure steam boilers and (2) new combination nat gas/#2 oil burners. no change in means of egress, use group, or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary supported scaffold per plan submitted. Scaffolding associated with the following job numbers M01194927-I1 and M01194927-S1. Work shall comply with 2022 bu…
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, o…
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Alt1 filed to convert apartment in basement to doctor's office. interior alterations for basement and 1st floor including partitions and finishes as per plans filed herewith.
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Application filed for Minor furring on 1 & 2; combining units on the third floor and correct certificate of occupancy.
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or…
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and paint…
Filing for construction renovations of penthouse solarium as per plans filed. No change in use, egress or occupancy.