1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Replace (2) new low pressure steam boilers and (2) new combination nat gas/#2 oil burners. no change in means of egress, use group, or occupancy.
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Steel repairs in conjunction with Facade repairs filed under job# M00968463-I1.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy
Minor interior work to include new interior finishes. no exterior work, no change in egress or use.
Installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Non-structural exterior work to includes new masonry opening for installation of mechanical equipment; new louver in existing window opening; and replacement of existing louvers as…
Plumbing scope and new sprinkler system installation associated with townhouse renovation as per plans filed herewith.
Hunter College North Bldg Cooling Tower Steel Dunnage Repairs: Repairs of existing steel beams & girders. Scraping & painting of existing steel lintels/spandrels beams, remove & re…
Mechanical work in conjunction with Alt 1
New and replaced fixtures and appliances at new rough-in locations per plans.
application filed for facade & roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application
Plumbing scope for initial gc job filing. existing bathroom and kitchen fixtures to be replaced. no change in use, occupancy or egress.
Proposed interior renovation of 4fl apt#4f of existing 4 story building.to replace existing flooring, ceiling, new painting throughout, construction as per plan. no change in egres…
Mechanical work related to renovation of Apt. 8A as per plans filed herewith. No change in use, egress, or occupancy.
Herewith filing for modification to the plumbing fixtures in apt 5h and 11h as per plans. no change to use occupancy or egress under this paplication.