1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Interior renovation of an existing triplex and exterior work including window enlargements.
General construction modifications taking place on the Cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
Interior renovation as shown. no change in use, occupancy or egress. no alterations of structural system or exterior of the building
Renovation of existing apartment 14CD, work includes window openings, infills and new exterior wall vents, new window lintels. No change in use, egress or occupancy is involved.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Facade repairs as per plans been filled herewith.
Interior renovation of the apartment including wall and floor finishes and partition work as shown on plans filed herewith. there is no exterior work proposed. no change to use, eg…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application.
Interior Renovation proposed for a 5-story single family home. New non-structural partitions to be installed. Exterior work is not proposed. There will be no change to use, occupan…
Installation of roof protection at neighboring roof (842 5th Ave) during work at 4 E 66 street, as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use…
Installation of suspended scaffold for facade work or inspection
Nstallation of four ac units
Partial removal of structural slabs and framing at 15th, 16th, and roof levels. partial removal of non-load bearing masonry wall at 16th floor all as shown on drawings. filed in co…