1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of temporary Site Specific Engineered Enclosure System at rear of building per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use,…
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
New framing and temporary shoring for opening in rear masonry wall.
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Interior renovation as shown. no change in use, occupancy or egress. no alterations of structural system or exterior of the building
Masonry facade repairs as per plans. No change to use, egress, or occupancy.
Interior renovation of one family building. no change in use occupancy or egress this application.
Renovate existing building including new egress stair and new elevator. No change in use and no change to bulk of the building.
Perform interior partition, hung ceiling demolition & construction in conjunction with apartment renovation #6a. replace existing ptac units in same location and convector covers.…
Rigging for Industrial Rope Access
Replacement of air conditioning units in apartment apt. 9b, 9th floor residence with minor mechancial work as per plans filed herewith. no change in use,egress or occupancy
Installation of new mechanical systems in association with townhouse renovation, install new vrf heat pumps and associated piping and ductwork. install new ervventilation system. n…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Installation of temporary shoring as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
plumbing work filed in conjunction with apartment renovation
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.
Herewith filing for interior demo & fitout and exterior work as per plans. no change to use, occupancy, or egress.
Non-structural interior buildout (prada) work to include partitions, milwork, finishes, ceiling work as per plans. no change in use egress or occupancy.
Herewith filing partial demolition work/sequence, as per plans submitted. Work is filed in conjunction with ALT 1 #: 121330327 and M08008884.
Plumbing work associated with interior renovation of an existing class a apartment including new plumbing fixtures, new sanitary lines, new gas line. no change in use, egress, or o…